Elegant Shopping Palace Nanotechnology of PCI
Secure and economical

It was decided to apply the system products of PCI Augsburg GmbH at the „BLECHEN carré“. The decision was made due to the constant quality, the fast walkability of the surfaces even under bad job site conditions and the availability of the selected material according to the customer’s need because of a well functioning logistics. And after all there were positive experiences in the cooperation with PCI Augsburg GmbH with several other large projects.

Thanks to nanotechnology and unique light filler combination PCI Nanolight – the all-purpose product for all substrates – has a high coverage and good workability, is non-sagging, but has a long open time which makes work easier. The variable flexible mortar sets fast and cures without shrinking. The surfaces are walkable and groutable after eight hours.

PCI Nanoflott, a special multi-use flowable mortar especially developed for laying fully vitrified tiles can be applied as flowable mortar and also as non-sag thin-bed mortar. PCI Nanoflott cures well despite the long open time even at cool temperatures. The surfaces are walkable and groutable after about nine hours and can take loads after 48 hours

Date

17.12.2008

Task

Heavy cleaning machines, hand lifts and – hopefully – a whole lot of people, in addition cleaning chemicals every day, spills of food and de-icing salt in the winter, that is the everyday life of floorings in a shopping mall like the „BLECHEN“ Cottbus. An

City

Cottbus

Completion

2008

Size

16.500 m²

Products used

PCI Seccoral, PCI Nanoflott

Specialist advice

Frank Scholz

Owner

Gepro Bau mbH, Brieselang

General contractor

HOCHTIEF Construction AG, Cottbus

Architect

Richter Altmann Jyrch, Cottbus

Your contact for inquiries:

PCI Augsburg GmbH
Piccardstraße 11, 86159 Augsburg
Telefon: 0821 5901-0
Telefax: 0821 5901-416
E-Mail: pci-info@pci-group.eu
www.pci-augsburg.de

Impres­sions

Contact